Road connecting Hero Bakery Chowk to Ishmeet Singh chowk to remain close from July 19-25

Road connecting Hero Bakery Chowk to Ishmeet Singh chowk to remain close from July 19-25

Ludhiana, July 18, 2024; Due to railway work to double the railway line between Ludhiana and Mullanpur and upgrade the road surface and signalling system at the level crossing, railway crossing (No. 2/S) connecting Hero Bakery Chowk to Ishmeet Singh Chowk will be closed temporarily for one week from July 19 to 25. The traffic will be diverted through the adjoining railway crossing (No. S-2/A) near Middha Chowk.